Close
  • Make an Offer

  • This field is for validation purposes and should be left unchanged.

Key water Archive

Victoria risk of spill: September 10th

10 September 2020 – 2020/21 Risk of Spill update for Murray and Campaspe systems Resource Manager for northern Victoria Mark Bailey said today the risk of spill in the Murray and Campaspe systems during 2020/21 had reduced, but remained above the 10 per cent threshold needed to declare a low risk of spill. “The risk of.

Read more

Victoria Welcomes MDBA Split And End To Buybacks

4th Sep 2020 Victoria Welcomes MDBA Split And End To Buybacks The Commonwealth has adopted key Victorian positions on the Murray Darling Basin Plan, announcing there’ll be no buybacks as part of future water recovery and that the Murray Darling Basin Authority (MDBA) will be split. Minister for Water Lisa Neville today welcomed the Commonwealth’s.

Read more

September 2020 Allocation Announcements

15th September Murrumbidgee GS allocation increased 2% up to 46% NSW Murray GS allocation increased 3% up to 15% Victoria – The Murray system moves from 32 per cent of high-reliability water shares (HRWS) to 36 per cent HRWS. The Goulburn and Loddon systems increase from 47 per cent HRWS to 51 per cent HRWS..

Read more

Contact Us

  • This field is for validation purposes and should be left unchanged.